Research any Calgary property before your site visit. Know the zoning, setbacks, lot coverage, and requirements before you walk in the door.
Search any address for zoning, lot size, and land use district
Open Map →Check active and past DPs on any property
Open Tracker →Look up assessed value, building details, lot dimensions
Search →Official rules on secondary suite eligibility
View Rules →Full 1P2007 bylaw for every district
View Bylaw →Land titles, covenants, caveats ($10/search)
Search Titles →After the 2024 blanket rezoning, these districts generally allow backyard suites, garage suites, and secondary suites. If a property is in one of these zones, it's worth pursuing.
If a property shows a different district, check the City's secondary suite page — the 2024 rezoning expanded eligibility significantly. When in doubt, call 311.
Everything to verify before quoting a garage suite project.
Critical measurements and requirements for a legal basement suite.
Key items for a standalone garage build (without suite).
What to check before quoting a deck build.
Quick reference for R-CG and common residential districts. Always verify with the current bylaw for the specific land use district.
| Setback | R-CG | R-C1 / R-C1L | Notes |
|---|---|---|---|
| Front (principal) | 3.0m | 3.0m | From front property line |
| Side (principal) | 1.2m | 1.2m | Both sides unless corner lot |
| Rear (principal) | 7.5m | 7.5m | From rear property line |
| Rear (accessory/garage) | 1.2m | 1.2m | From lane or rear lot line |
| Side (accessory/garage) | 1.2m | 1.2m | From side property line |
| Max height (accessory) | 6.5m | 6.5m | Grade to peak |
| Max lot coverage | 45% | 45% | All buildings combined |
| Separation (buildings) | 3.0m | 3.0m | Between principal and accessory |
Do this before EVERY site visit — for any service.
Important things to know when working in Calgary.
311 is your friend. Call 311 for any zoning questions. They can confirm what's allowed on a specific parcel before you commit to a project.
2024 blanket rezoning changed everything. Most residential lots in Calgary were rezoned to R-CG, which allows secondary suites and backyard suites. Properties that couldn't qualify before may now be eligible.
DP processing: 4–12 weeks currently. Development permit timelines vary. Simple DPs can be faster, complex ones with relaxations take longer. Apply early.
BP processing: 4–12 weeks after DP approval. Building permits are a separate process after the DP is approved. Don't start construction until the BP is issued.
Inspection bookings: book early. City inspectors are busy. Book your inspections well in advance, especially framing and final. Delays here stall the whole project.
Winter building: plan accordingly. Foundation work typically stops in deep winter (below -20°C). Plan your schedule so foundations are poured before freeze-up, or budget for winter concrete measures.